Heavy Duty End Dump Trailers with Hydraulic Cylinder of 30m3 for Sale

Heavy Duty End Dump Trailers with Hydraulic Cylinder of 30m3 for Sale

one.Merchandise parameters
 

measurement 13000mm*2550*3440
payload 60ton 
tare weight  7000kg
axle 3x13ton/14ton/16ton/20ton   brand can be opentional 
suspension  mechanical suspension/air suspension/american sort/germany kind can be opentional
tire 11R22.5/12R22.5/eleven.00R20/12.00R20    brand can be opentional 
wheel rim 8.25/nine./8./eight.5 
kingpin  2″/three.5″
I  beam  up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm:
material:Q345B/T700
landing gear  jost c200 /fuwa  two pace 28ton 
flooring 3mm checkered plate
twist lock  Optional
spare tire carrier  2 pcs 
resource box 1
air wiring  doule air line 
electrical energy wiring 6 main wiring24v or 12v LED lamp
brake technique wabco relay valvedrum braket30/thirty brake chamber 
paiting  total chassis sand blastingelectrophoresis coating1 coat of anticorrosive key 2  coats of ultimate paiting
colour  Optional
accessories  brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp

two.Normal Procedure

one)cutting  
use the plasma slicing machine minimize the metal to minor components use for appropriate welding and splicing
 
2)welding  
after metal cutting process the up coming step is welding .this method the principal operate is beam welding .the top plate-bottom plate and the
middle  plate  will  be welding with each other .  this method will be use submerged arc welding process.this kind of welding is extremely
specific .its exclusively utilised in I beam welding .right after this welding method other areas of the trailer will be use distinct welding way
for diverse steel-argon arc welding-electric powered arc welding-manual welding-gasoline welding and so on
 
three)blasting
this method is use for the first phase of surface cleanness-anxiety relief-derusting before paiting .
 
four)electrophoresis coating  
this method use for a lot more detail floor cleanness
 
five)epoxy zinc primer spray coating 
this process is the long lasting one particular before paiting .right after this process the trailer an be paiting
 
six)assembly
soon after all the procedure we have mationed .the very last process of the trailer is assembly.this process all the areas will be assemly .it which includes tire-wheel rim-king pin-landing equipment-suspension-spring leaf -brake chamber-air wiring-electrical power wiring-brake technique and so on

seven)packing 
The very last approach is packing .all the trailer use various packing way as buyer requirment.following packing the trailer can be on the way to the consumer

 

Heavy Duty End Dump Trailers with Hydraulic Cylinder of 30m3 for Sale