15m Mobile Concrete Placing Boom with Proportional Solenoid Valve

15m Mobile Concrete Placing Boom with Proportional Solenoid Valve

15m Cellular Concrete Inserting Increase With Proportional Solenoid Valve

In get to increase the positioning assortment of concrete pump and improve the mechanization of pumping development, our firm have investigated and created the new hydraulic mobile concrete putting increase sequence of concrete inserting increase HGY-thirteen,HGY-15,HGY-seventeen,HGY-18 and HGY23/4R(the variety is the putting radius).
 
The mobile concrete inserting increase is the assorted gear of concrete pump. Its application extends the shipping and delivery selection of concrete, effectively solves the issue of wall portray and plays an critical function in improving development efficiency and decreasing the labor depth. 
 
This series of mobile concrete placing increase have affordable style and dependable framework. The putting structure adopts 360 diploma rotary arm assistance. The mobile concrete inserting growth is operated by hands and can rotate flexibly. The tower is of a proper height so you can modify the placing placement freely only by pulling the robe effortlessly. So it is extremely effective, reputable and economic. 

Element one–13m: Primary specialized parameter of cell concrete placing increase

Model HGY13
Growth size 13m
Hose size 3m
Rotatary angle 360°
Rotating velocity .23r/min
Elevation angle -2°~eighty four.4°
Method stress 20MPa
Motor electrical power 4Kw
Revolution speed .two~.3r/min
Travel method Completely hydraulic drive
Pipe type Φ125
CZPTng leg observe three.15×3.15m
Size:  six.6×2.0×3.1m
Bodyweight Self fat 2.7t
Equilibrium fat one.8t

Component 2–15m: Principal complex parameter of Mobile Concrete Putting Increase

Placing RADIUS 15000mm
Placing Top 14120mm
Positioning DEPTH 10300mm
Increase ARM ELEVATION Journey 0°~90°
SLEWING Selection 360°
CZPT Method Electrical power 4kW
WORCZPT Strain 20MPa
SLEWING Pace .2~.3r/min
CONCRETE PIPE DIAMETER Φ125×4
RUBBER HOSE 3m
OUTRIGGER SPAN 4000×4000mm
Complete Fat 4500kg
COUNTERWEIGHT 2×1100kg
THE MOST UNFAVORABLE PROCESSING Condition Increase Total VERTICAL Power 67kN
THE MOST UNFAVORABLE PROCESSING Condition Increase Complete Feet Assistance Response 45kN
Overall DIMENSION 8900×4000×2585mm

Component 3–18m: Major technical parameter of Cell Concrete Putting Increase

CONCRETE PIPE DIAMETER Φ125mm
Placing RADIUS 18m
Boom ARM ELEVATION Vacation -4°~86°
SLEWING Range 360°
RUBBER HOSE 3m
CZPT Technique Electrical power five.5KW
WORCZPT Stress 20Mpa
SLEWING Velocity .two~.3r/min
Overall Bodyweight 8900kg(like counterweight )
Whole Top 3683mm
COUNTERWEIGHT 2×1000kg
THE MOST UNFAVORABLE PROCESSING Problem Growth Complete VERTICAL Power 105kN
THE MOST UNFAVORABLE PROCESSING Issue Growth Overall Toes Assistance Response 70kN

Portion 4–23m: Major specialized parameter of Cellular Concrete Placing Growth

Pipeline diameter φ125
Radius of placing growth(m) 23m
Max. Placing top (m) 26.5m
Drive mode Fully hydraulic travel
Slewing assortment 360°
Hose duration 3m
CZPT Method Power 22kw
Program Force 32Mpa
Rotary pace .32r/min
Weight 10000kg

Component five: Packing and CZPT of Mobile Concrete Inserting Boom

We consider care of your purchase!
one. Best manufacturer in North CZPT.
two. A factory with over 20 years’ experience. 
three. Professional teamwork of every process.
4. Competitive price and perfect quality.
five. Efficient after-sale service.

CZPT Equipment Answers:
1. Why must I choose your Concrete Placing Boom?
We are a professional producer of Concrete Positioning Increase for twenty many years,In our region, we attended several countrywide assignments and the consumers are satisfied with our good quality. All these can satisfy your requirements. So I feel our product is your greatest selection.
 
2. Do you have CE certification and do you have ISO9001:2008 certification?
Indeed, all our Concrete Inserting growth are CE qualified and our creation method has passed the ISO9001:2008 standards.
 
three. Which country have you exported to?
CZPT Concrete putting growth have exported our items to North America,France,Algeria, Indonesia, Russia, Kazakhstan, Kyrgyzstan and Turkey and so forth.
 
four. What about the Concrete Inserting Boom delivery time?
CZPTly, the manufacturing time is about fifteen-thirty days. The transportation time is diverse in accordance to your area.
 
five. What about the right after-sale provider and solution warranty.
We will dispatch our engineers to your region to help you with the installation and instruction your personnel. The warranty time is twelve thirty day period following it developed.
 
6. What about the cost of Concrete Putting Boom?
We assure to give you the most favorable cost to set up a prolonged-expression earn-win cooperation with you.
 
seven. What payment method can you take?
CZPTly, T/T or one hundred% LC at sight is the ideal for us.
 
eight. Can we be your agent in our region? 
Of course, no problems for our Concrete Putting Increase .

After-sale Service
1.May enjoy the life-long service after you buy our products.
two.Training the operator for free.
3. Under the condition that foundation, water source, power source, aggregate, hosting 
   products, auxiliary staff is ready. Engineers are available if you need.
four.Certain quantity stochastic tool will be provided while delivering goods.
5.Within 48 hours service will be available according to different regions after received 
    the telephone. 
six. For exported products, Our company sends the constructor to help to operate and 
    management equipment, time according to your needs. The related fee will be undertaken 
    by buyers.
7. Promptly provides the fittings according to users’ demands, handles for the user consigns 
    for shipment.
8. All products (easy worn parts not included) loss caused by non-human factors will be 
    free of charge for half a year.
9. Provides the technology advisory service as necessary.
10. Please contact me via telephone when you have any problems with the plant.

CZPT Machinery is a organization specializing in the investigation, design and style and creation of construction equipment for practically 20 many years. We offer the most reasonable solution according to the particular demand from distinct customers. Our primary items for building machinery are as follows: concrete pump,concrete placing growth,Concrete mixer, concrete batching plant, diesel concrete mixer, self loading concrete mixer so on. With several studying and generating bases in CZPT, we can give the potent complex service and higher top quality machinery for the clients all over the world.   

15m Mobile Concrete Placing Boom with Proportional Solenoid Valve