High quality higher grade metal concrete putting boom with self jack-up hydraulic program
Tower Column hydraulic jack-up concrete positioning increase, Self-climbing type, climbing by ground frame or by shaft frame. Mostly utilized for concrete positioning of development undertaking, including civil development, plant design, bridge building, beam yard, nuclear power plant, infrastructure, and so on.
Charactics
Modular layout, mechanical and electrical integration manage, folding boom, tube column, floor body and shaft frame. Integration of sophisticated features and merchandise diversification, to obtain a larger merchandise portfolio, improve the applicability of the item.
Imported hydraulic and electrical factors, adopt quality quickly coupling for hydraulic pipelines, which is converted rapidly, it can properly solve the issue of oil leakage in the method of assembling and dismantling, and steer clear of the air pollution of the surroundings. Safety and dependability
sections R variety hydraulic boom, large round arc, novel and stunning visual appeal, compact structure, and the lightweight style of the growth, which diminished the excess weight of the complete equipment..
Easy to transportation and put in.
Outfitted with self-climbing frames which are pushed by hydraulic and which climb up instantly from the current flooring to the desired flooring alongside the holes originally prepared in elevator effectively, the placing booms rise with the growing floor, preserving time and labor.
Characteristics
A.Increase
The arced boom structure is optimized by applying CPU design. The boom adopted high-strength steel plate for production with scientific process. It features beautiful appearance, superior rigidity and intensity, ensuring excellent and reliable quality.
B. CZPT technique
C series products adopted Germany CZPT solenoid directional control valve and balance valve
with secondary overflow. It has effectively avoided the potential damages of boom
which might be caused by over speed movement when the boom drops down, and sudden
increase of oil cylinder’s pressure under external forces, thus the reliability of the boom
has been increased.
C.Inner CZPT Oil Tank
Inner hydraulic oil tank renders a compact structure and free swivel. It gives big
convenient for installation, dismounting and maintenance, which ensure longer service
life and excellent performance.
D.Climbing Facility
As a rectangular frame structure, the climbing facility is flexible, reliable and convenient
for dismounting.
E.Slewing Mechanism and Reducer
Slewing reducer adopted products made by the world famous brand of Italy Comer, with
a great torsion. Being accompanied with the integrated slewing balance valve made by
Germany Hawei, it achieves smooth operation and reliable and stable performance.
F.Wi-fi Remote Controller
C series products adopt industry-exclusive analogue wireless remote controller made by ZheCZPT TELECRANE, which is easy and convenient to operate, highly resistant to
disturbance and reliable in performance.Each series are accompanied with wired remote controller for use in necessity.
G.CZPT Control Program
The electric control system adopted world famous brand of electric components, such
as Japanese Omron and French Schneider. The multi automatic protection is set up in
the control program, so as to avoid misoperation and ensure the system’s reliability.
H.Column
The column is made of high-strength steel plate in square shape, with nice appearance,
rigidness and intensity, as well as high reliability.
Alternative:
u Inner-climbing frames: Ground frames or Wall frames(Shaft frames)
u Column: 2m-10m.
u Mode of slewing: Gear slewing or rack & Bearing of stepless slewing.
u Voltage: 380V/50Hz or 440V/60Hz
u Radio distant Handle: Tele Crane HBC or AUTEC
29m Tower Jack-up Concrete Positioning growth Specs:
| Model | Units | HGY29C | ||
| Functionality | Max.radius of placing boom | m | 28.nine | |
| Freestanding height (to the joint between the stop of the increase and swivel table) | m | 22.7 | ||
| Growth articulation | ° | 400 | ||
| Slewing brake | / | always near | ||
| Functioning temperature | ºC | 0ºC~60ºC | ||
| Whole fat | kg | 19100 | ||
| Counter fat | kg | Have no | ||
| Energy | / | 380V/50HZ | ||
| Motor | Product | / | Y2-160M-4 | |
| Energy | kW | eleven | ||
| CZPT technique |
Force | MPa | 30 | |
| Flux | l/min | 18 | ||
| CZPT oil |
Circumstance temperature 35ºC-50ºC | / | L-HM 68 | |
| Circumstance temperature 5ºC-35ºC | / | L-HM 46 | ||
| Circumstance temperature -15ºC-5ºC | / | L-HM 32 | ||
| Manage mode |
/ | Quick-haul Control /radio remote handle | ||
| Pipeline cleaning | / | Wet cleansing/Dry cleansing |
||
| Framework of tower body | / | Tubular column | ||
| Segment of tower human body | m×m | .75×0.75 | ||
| Boom |
Shape | / | A few hydraulic foldable arms | |
| Interior diameter of pipeline | mm | DN125 | ||
| End hose | ″×mm | 5″×3000 | ||
| 1st part | Duration | m | eleven.five | |
| Articulation | ° | 0°~eighty two.5° | ||
| 2nd section | Size | m | nine.3 | |
| Articulation | ° | 0°~180° | ||
| 3rd segment | Size | m | 8.1 | |
| Articulation | ° | 0°~180° | ||
| Climbing |
Climbing manner | / | By hydraulic cylinder climbing |
|
| Interval of climbing | m | .fifty two | ||
| Flooring body | / | Hole geared up in flooring |
||
| Shaft body | m | Gap geared up in floor two.~2.7 |
||
| Min.Interval of climbing frame | Climbing | m | three. | |
| Positioning concrete | m | 6. | ||
| Relaxation | m | 6.0 | ||
29m Putting BoomWorking Selection :
33m Tower Jack-up Concrete Positioning boom Specs:
| Model | Units | HGY33E | ||
| Overall performance | Max.radius of positioning increase | m | 33 | |
| Freestanding peak (to the joint between the end of the growth and swivel desk) | m | 22.7 | ||
| Increase articulation | ° | 400 | ||
| Slewing brake | / | always near | ||
| Functioning temperature | ºC | 0ºC~60ºC | ||
| Complete excess weight | kg | 21200 | ||
| Counter bodyweight | kg | Have no | ||
| Power | / | 380V/50HZ | ||
| Motor |
Product | / | Y2-160L-4 | |
| Power | kW | fifteen | ||
| CZPT method |
Stress | MPa | thirty | |
| Flux | l/min | 18 | ||
| CZPT oil |
Circumstance temperature 35ºC-50ºC | / | L-HM sixty eight | |
| Circumstance temperature 5ºC-35ºC | / | L-HM forty six | ||
| Circumstance temperature -15ºC-5ºC | / | L-HM 32 | ||
| Manage method | / | Limited-haul Control /radio remote handle | ||
| Pipeline cleaning | / | Soaked cleansing/Dry cleaning |
||
| Composition of tower physique | / | Tubular column | ||
| Section of tower entire body | m×m | .75×0.75 | ||
| Increase |
Condition | / | 3 hydraulic foldable arms | |
| Interior diameter of pipeline | mm | DN125 | ||
| End hose | ″×mm | 5″×3000 | ||
| 1st part |
Size | m | 12.38 | |
| Articulation | ° | 0°~82.5° | ||
| 2nd area | Duration | m | 10.93 | |
| Articulation | ° | 0°~180° | ||
| 3rd section |
Duration | m | 9.69 | |
| Articulation | ° | 0°~180° | ||
| Climbing |
Climbing manner | / | By hydraulic cylinder climbing | |
| Interval of climbing | m | .52 | ||
| Flooring frame | / | Hole geared up in flooring | ||
| Shaft body | m | Gap prepared in ground two.~two.seven |
||
| Min.Interval of climbing frame | Climbing | m | 3. | |
| Putting concrete | m | six. | ||
| Relaxation | m | 6.0 | ||
33m Placing BoomWorking Variety :
Tower Column Concrete Inserting Boom Installation:
Tower Positioning Boom Job website Performance: