
.5-one.0mm*1250mm Cut TO Duration LINE Device
one. Information of YX1250-1. Minimize to Duration Machine Line
| Content | |
| Content Thickness(&):.five-1.0mm |
|
| Applicable material:Galvanized Steel Coils, Very hot Rolled Coils,Cold Rolled Coils,yield energy 245Mpa or 550Mpa | |
| Equipment Parts | |
| 1)CZPT Decoiler: one particular established | |
| Un-powered, Manually manage metal coil interior bore shrinkage and stop Max Feeding width:1250mm,coil ID selection 508mm±30mm Potential: Max. 5 Ton |
|
|
|
|
| 2) Cold Rolling Mills: | |
| Ideal Content thickness(mm): 0.five-1. Width(mm):400,650,800,a thousand,1250 Line velocity:15-18m/moment With shearing function With rubber rolling feeding device Primary equipment motor:7.5KW With PLC handle technique
|
|
| three)CZPT Reducing unit | |
| Post to cut, quit to chopping,Two pieces type of chopping blade design and style, no blanking CZPT motor: 5.5KW Cutting force: -16Mpa Cutting tool materials: Cr12MoV Warmth treatment method to HRC58-62 degree The cutting electricity is offered by the principal engine hydraulic station
|
|
| four)PLC Manage System | |
| Control The CZPTtity And Cutting Length Automatically Input The Generation Knowledge(Generation Batch,pcs,Size,and so forth.)On The Touch Display , It Can Finish The Production Immediately. Blended With: PLC, Inverter, Contact Display screen, Encoder, and many others PLC:Siemens (German brand)/Schneider(French manufacturer) Inverter:Siemens (German model)/Schneider(French model) Encoder: Omron (Japan brand) Swap Base, Reveal Light, Electricity Offer, Intermediate Relay, AC Contactor, Lower-to-Duration Tolerance≤±1 mm Manage Voltage 24V
|
|
| five) Exit Rack Un-driven, 3 units |
two. Device Functions of YX1250-one. Lower to Length Machine Line
The benefits of metal roof panel chilly roll forming machineare as follows:
one.Straightforward procedure, reduced routine maintenance expense
2.Substance conserving
3.Short building period
4.Price conserving
After-Sale Support
1. The warranty is 24 months after the client receives the machine.
Within the 24 months, we will courier the replacement parts to the client free of charge
2. We offer technical support for the entire life of our machines
three. We can send our technicians to install and train the workers in the clients’ factories with
extra cost
Phrases Of CZPT
one.Minimum order quantity (MOQ): 1 Set
two.Delivery time: about 45 workdays
3.Port of loading: port of HangCZPT
4.Type of payment: by T/T or by L/C
5.Export:to far more than 60 international locations and regions, which includes ZheCZPT , British isles, France, Singapore,
Greece, Australia, USA, Mexico, Brazil, Chile, Xihu (West Lake) Dis.through, Trinidad, Israel, Saudi Arabia, and so forth
Packing Design
Packing approach: Main body of device is bare and coated by plastic film(to safeguard of dust and corrosion),
loaded into container and steadily set in container appropriate by metal rope and lock, suitable for prolonged-distance transportation.
ABOUT BMS
Factory
EXHIBITION
High quality IS OUR Culture!
IF U ARE Fascinated OUR Machines ,
Please Make contact with WITH ME!
