
Specification
|
Model |
Puzzle parking multilevel method |
|
Ground obtainable |
From 2 flooring to thirty ground |
|
Drive mode |
CZPT + cable |
|
CZPTing capacity |
2000kg/2500kg/CZPT |
|
Manage |
PLC(Omron) |
|
Operation |
Button or IC playing cards, manual for crisis |
|
Production process |
CNC shears, CNC bending, CNC flame cutting machine, robotic welding |
|
Finishing |
Sand blasting, Zinc spray, floor portray for defense |
|
Outer packing |
Nude packing, simple packing, 50 percent packing, total packing |
|
Set up |
We provide in depth set up guide, drawing of basis. If needed, we could deliver engineer for on-website set up assistance. |
Feature
one. optional type parking program for your option: puzzle parking program (from two to 15 floor) tower
parking (from eight to thirty flooring)
2. optional generate method: each hydraulic and electrical are offered.
3.a number of patents for puzzle parking program: patent for improving constructing stage from 5 floors to thirty floors,
patent for anti-falling body.
four.efficient operation: the operating pace of method is 3-5 times faster than other products, to save a extended
waiting time for drivers.
5.the applacation of new materials and technology for pulley: MC oily reinfored material instead of gray
cast iron content, to improve pulley’s working life three times and cable’s working existence 10 occasions.
6. a variety of techniques of operation: IC card, Button and Manual operation.
7. automated manage system: PLC(Omron).
