| Title | eight” Aluminum Metal Piping for Pipe Techniques fabrication |
| Normal | ASTM A312, ASTM A213/ASME SA213, ASTM A179/ASME SA179 |
| Substance | 304, 304l, 316l, T5, T9, T11, T22,and so forth… |
| OD | 19-89mm |
| WT | 2-10mm |
| Size | -28000mm |
| Surface treatment | solution annealing/Normalization/Tempering |
| Test requirement | 1.one hundred% PMI / SPECTRO CHEMICAL ANALYSIS TESTS 100% PMI |
| 2.a hundred% DIMENSION TESTS & 100% VISUAL EXAMINATION | |
| 3.TENSION TEST, FLARING TESTS(FOR SEAMLESS TUBE/PIPE)/FLANGE TESTS(FOR WELDED TUBE/PIPE), HARDNESS TEST, REVERSED FLATTENING TEST | |
| four.one hundred% HYDROSTATIC TEST/100% NON-DESTRUCTIVE TESTS | |
| NOTES : ALL THE TESTS AND INSPECTION NEED TO PROVIDE WITH REPORTS ACCORDING TO STHangCZPTRD AND TEST RESULTS. | |
| OPTION TEST & INSPECTION ITEMS: | |
| 1.STRAIGHTNESS TEST | |
| 2.ROUGHNESS TEST | |
| three.CRYSTALLING PHASE ANALYSIS | |
| four.INTERGRANULAR ATTACK TESTS | |
| five.SHIPPING NOTIFICATION BEFORE SHIPMENT | |
| Deal | In bundles, plywood cases, wooden cases with water-proof package, etc. |
| Product processing | Cold drawn |
| Product origin | CZPT(main land). |
| Finishes | PE, BE. |
| CZPT terms | FOB, CIF, CFR, EXW, etc. |
FAQ
Q: How many days can you deliver after confirmed the order?
A: For stock: within 5-7 days
For CZPT product: all around 30 days
For special sizes: matter to negotiation.
Q: How does your company do top quality handle?
A: ISO 9001:2015 certified
Product certification as for each EN15714 3.one or 3.2 as for every customer’s ask for.
Q: Can I have a manufacturing facility-pay a visit to?
A: Surely. All consumers are welcome to pay a visit to us in CZPT.
Q: Can I have a trial order?
A: Of course, it is an honor for us to have the possibility to show our quality and service.