
Use
This products is ideal for forming the copper pipe (flaring, shrinking, punching ring, and so forth.). 1 double station and a single single station can be employed simultaneously or asynchronously (for fridge compressor suction and exhaust copper tube processing).
Attributes
- Utilizing hydraulic, pneumatic and electrical management systems, entirely taking into consideration security and other variables, convenient debugging and basic operation, employing heavy-obligation oil cylinders as the major shaft punch, can fully meet up with the manufacturing of refrigeration pipe merchandise, computerized discharge soon after discharge, rhythm Quickly and effective.
- The tools control method has an automatic counting purpose, which can correctly rely the processing amount.
- The punch mechanism utilizes double linear guides.
Equipment parameters
| NO. | Parameter objects | Material |
| 1 | Pipe diameter range | Φ5.-10mm |
| two | Pipe thickness range | .five-1.0mm |
| 3 | Pipe length variety | forty-120mm |
| four | Work efficiency | 1000-1500PCS/H |
| five | Number of stations | Principal: Second chilly demand Deputy: First chilly cost |
| six | Station relocating method | CZPT |
| 7 | Clamping method (oil tank bore * stroke) | 50*35mm |
| 8 | Major and auxiliary punch feeding approach (oil tank bore * stroke) | Main: sixty three * 75mm Vice 50 * 50mm |
| 9 | Size error | ≤0.25mm |
| ten | Coaxiality error | ≤0.08mm |
| 11 | Processing techniques | Cold forging |
| twelve | Travel strategy | CZPT / Pneumatic |
| thirteen | Feeding technique | Automobile feeding |
| fourteen | Operation technique | Auto / Manual / Jog |
| fifteen | CZPT control method | CNC technique |
| 16 | air pressure | .five~.8MPa |
| 17 | CZPT pressure | four-10MPa |
| 18 | Oil pump motor | A few phase380V/3.7Kw |
| 19 | Electrical power method | A few phase380V/50HZ |
| twenty | General proportions (length X width X peak) MM | 1700x800x1600 |
CZPT framework and method configuration
- Overview: The equipment is composed of a frame, an air manage program, a hydraulic shift, a hydraulic system, and an CZPT handle system etc.
- Frame: The fuselage is welded by profiles, and processed after vibration growing older to guarantee rigidity and precision of the mounting aircraft. It is equipped with four top-adjustable foot cups and safety security doorsThe areas of every component of the tools are subjected to needed floor remedies this kind of as electroplating, blackening, quenching, carburizing, electrostatic spraying, etc. in accordance to the genuine doing work circumstances and doing work surroundings to meet up with the components with ample energy and floor features.
- CZPT change:It is driven by a hydraulic change cylinder and uses a guide rail to form a movement pair with large precision.
- Air handle system: The compressed gasoline from an external supply is purified by a precision drinking water-fuel separator. The strain can be adjusted to offer a very good fuel surroundings for each circuit part. The specific position of the cylinder piston is controlled by the electrical valve entire body. Pneumatic factors ensure the sensitivity and balance of numerous steps for the duration of lengthy-phrase use.
- CZPT method:The integral oil tank is equipped with an air cooling technique to ensure that the system oil temperature is not greater than fifty five ° C. This products employs a variable displacement pump and the oil circuit utilizes an power-conserving style. The major directional valve and oil pump are made of higher top quality items. And slow ahead two groups, the speed can be altered individually.
- Coloring:The primary entire body of the gadget is blue (Jisun color variety JS-SK-003), and warning symptoms are positioned on the elements included in personal safety.
- CZPT control cabinet:Making use of the CNC method, the air swap adopts domestic large-top quality air switch, Schneider button, and other main electrical components these kinds of as decide on switches and intermediate relays are all OMRON goods. The control circuit is offered with overload defense perform.
- The set up of the electrical factors of the products complies with the appropriate nationwide laws and has a reputable grounding gadget. The terminals, contactors and tiny air switches in the electrical box are put in in the VDE regular V-groove. Each and every electrical part is plainly marked. The electric powered manage cabinet employs all-plastic combing cabinets with wire trunking for clear wire numbers the management panel is clean and the subtitles on the symptoms are very clear and simple to see.
List of principal elements and routine maintenance
Listing of major components
| NO. | Name | CZPTtity | Brand |
| one | CNC method | one established | JISUN |
| two | Pneumatic Parts | 1 batch | AIRTAC |
| three | Leakage swap | one piece | CHINT |
| four | Clear shell fuse | 1 piece | CHINT |
| five | Switching energy | 1 piece | MW |
| six | CZPT motor | 1 piece | JUNTAI |
| seven | CZPT oil pump | 1 piece | XIHU (WEST LAKE) DIS. |
| 8 | CZPT elements | one batch | RISEN |
| nine | Electromagnetic contactor | 1 piece | TAIAN |
| 10 | Thermal relay | 1 piece | TAIAN |
| 11 | Intermediate relay | 1 set | OMRON |
| twelve | Proximity swap | one batch | YM |
| thirteen | Xihu (West Lake) Dis. | one batch | TBI |
- Check out the air / oil pressure and the condition of every single fastener everyday to make sure dependable use.
- Frequently lubricate shifting parts and preserve the gear tidy.
- Clear the dust of the equipment routinely to stay away from influencing the procedure and item good quality.
- The regular doing work time of the equipment is calculated from 8-ten hrs for each working day. If the functioning time is lengthier owing to creation, the inspection and update of wearing areas, motors and other accessories need to be strengthened to guarantee the balance of the products.
Companies and other
- Product good quality warranty for one yr, (other than for synthetic or irregular use) donning parts are not provided in the warranty scope. For details, please refer to the “putting on areas checklist” in the instruction manual.
- You are extremely welcome to go to our manufacturing unit to see our equipment how to work ahead of you location an buy with us.
- This solution is delivered randomly: a handbook and a set of molds (if other requirements are needed, the expense will be quoted separately).
- If consumer have any question about procedure when employing our machine,we will reply you by electronic mail/phone/other on the internet chat instrument inside 24 several hours.
- The customer needs to provide electricity voltage, compressed air fuel source and grounding units in accordance with electrical specifications on the site of the manufacturer’s workshop the consumer have to configure the cables and air pipes related to the equipment.
- The circulating cooling drinking water, hydraulic oil (advised to use 46 brand name hydraulic oil), lubricating oil and cooling oil needed by the tools are purchased by the purchaser.
