Quality High Grade Steel Concrete Placing Boom with Self Jack-up Hydraulic System

Quality High Grade Steel Concrete Placing Boom with Self Jack-up Hydraulic System

High quality higher grade metal concrete putting boom with self jack-up hydraulic program

Tower Column hydraulic jack-up concrete positioning increase, Self-climbing type, climbing by ground frame or by shaft frame. Mostly utilized for concrete positioning of development undertaking, including civil development, plant design, bridge building, beam yard, nuclear power plant, infrastructure, and so on.

Charactics
Modular layout, mechanical and electrical integration manage, folding boom, tube column, floor body and shaft frame. Integration of sophisticated features and merchandise diversification, to obtain a larger merchandise portfolio, improve the applicability of the item.

Imported hydraulic and electrical factors, adopt quality quickly coupling for hydraulic pipelines, which is converted rapidly,  it can properly solve the issue of oil leakage in the method of  assembling and dismantling, and steer clear of the air pollution of the surroundings. Safety and dependability

sections R variety hydraulic boom, large round arc, novel and stunning visual appeal, compact structure, and the lightweight style of the growth, which diminished the excess weight of the complete equipment..

Easy to transportation and put in.

Outfitted with self-climbing frames which are pushed by hydraulic and which climb up instantly from the current flooring to the desired flooring alongside the holes originally prepared in elevator effectively, the placing booms rise with the growing floor, preserving time and labor.

Characteristics

A.Increase
The arced boom structure is optimized by applying CPU design. The boom adopted high-strength steel plate for production with scientific process. It features beautiful appearance, superior rigidity and intensity, ensuring excellent and reliable quality.

B. CZPT technique
C  series products adopted Germany CZPT solenoid directional control valve and balance valve
 with secondary overflow. It has effectively avoided the potential damages of boom
 which might be caused by over speed movement when the boom drops down, and sudden 
increase of oil cylinder’s pressure under external forces, thus the reliability of the boom
 has been increased.

C.Inner CZPT Oil Tank
Inner hydraulic oil tank renders a compact structure and free swivel. It gives big 
convenient for installation, dismounting and maintenance, which ensure longer service 
life and excellent performance.

D.Climbing Facility
As a rectangular frame structure, the climbing facility is flexible, reliable and convenient
for dismounting.

E.Slewing Mechanism and Reducer
Slewing reducer adopted products made by the world famous brand of Italy Comer, with 
a great torsion. Being accompanied with the integrated slewing balance valve made by 
Germany Hawei, it achieves smooth operation and reliable and stable performance.

F.Wi-fi Remote Controller
C series products adopt industry-exclusive analogue wireless remote controller made by ZheCZPT  TELECRANE, which is easy and convenient to operate, highly resistant to
disturbance and reliable in performance.Each series are accompanied with wired remote controller for use in necessity.

G.CZPT Control Program
The electric control system adopted world famous brand of electric components, such 
as Japanese Omron and French Schneider. The multi automatic protection is set up in
the control program, so as to avoid misoperation and ensure the system’s reliability.

H.Column
The column is made of high-strength steel plate in square shape, with nice appearance,
rigidness and intensity, as well as high reliability.
 
Alternative: 
u  Inner-climbing frames: Ground frames or Wall frames(Shaft frames)
u  Column: 2m-10m.
u  Mode of slewing: Gear slewing or rack & Bearing of stepless slewing.
u  Voltage: 380V/50Hz or 440V/60Hz
u  Radio distant Handle: Tele Crane HBC or AUTEC

29m Tower Jack-up Concrete Positioning growth Specs:

Model Units HGY29C
Functionality Max.radius of placing boom m 28.nine
Freestanding height (to the joint between the stop of the increase and swivel table) m 22.7
Growth articulation ° 400
Slewing brake / always near
Functioning temperature ºC 0ºC~60ºC
Whole fat kg 19100
Counter fat kg Have no
Energy / 380V/50HZ
Motor Product / Y2-160M-4
Energy kW eleven
CZPT technique
 
Force MPa 30
Flux l/min 18
CZPT oil
 
Circumstance temperature 35ºC-50ºC / L-HM 68
Circumstance temperature 5ºC-35ºC / L-HM 46
Circumstance temperature -15ºC-5ºC / L-HM 32
Manage mode
 
/ Quick-haul Control /radio remote handle
Pipeline cleaning / Wet cleansing/Dry cleansing
 
Framework of tower body / Tubular column
Segment of tower human body m×m .75×0.75
Boom
 
Shape / A few hydraulic foldable arms
Interior diameter of pipeline mm DN125
End hose ″×mm 5″×3000
1st part Duration m eleven.five
Articulation ° 0°~eighty two.5°
2nd section Size m nine.3
Articulation ° 0°~180°
3rd segment Size m 8.1
Articulation ° 0°~180°
Climbing
 
Climbing manner / By hydraulic cylinder climbing
 
Interval of climbing m .fifty two
Flooring body / Hole geared up in flooring
 
Shaft body m Gap geared up in floor
two.~2.7
Min.Interval of climbing frame Climbing m three.
Positioning concrete m 6.
Relaxation m 6.0 

29m Putting BoomWorking Selection :

33m Tower Jack-up Concrete Positioning boom Specs:

Model Units HGY33E
Overall performance Max.radius of positioning increase m 33
Freestanding peak (to the joint between the end of the growth and swivel desk) m 22.7
Increase articulation ° 400
Slewing brake / always near
Functioning temperature ºC 0ºC~60ºC
Complete excess weight kg 21200
Counter bodyweight kg Have no 
Power / 380V/50HZ
Motor
 
Product / Y2-160L-4
Power kW fifteen
CZPT method
 
Stress MPa thirty
Flux l/min 18
CZPT oil
 
Circumstance temperature 35ºC-50ºC / L-HM sixty eight
Circumstance temperature 5ºC-35ºC / L-HM forty six
Circumstance temperature -15ºC-5ºC / L-HM 32
Manage method / Limited-haul Control /radio remote handle
Pipeline cleaning / Soaked cleansing/Dry cleaning
 
Composition of tower physique / Tubular column
Section of tower entire body m×m .75×0.75
Increase
 
Condition / 3 hydraulic foldable arms
Interior diameter of pipeline mm DN125
End hose ″×mm 5″×3000
1st part
 
Size m 12.38
Articulation ° 0°~82.5°
2nd area Duration m 10.93
Articulation ° 0°~180°
3rd section
 
Duration m 9.69
Articulation ° 0°~180°
Climbing
 
Climbing manner / By hydraulic cylinder climbing
Interval of climbing m .52
Flooring frame / Hole geared up in flooring
Shaft body m Gap prepared in ground
two.~two.seven
Min.Interval of climbing frame Climbing m 3.
Putting concrete m six.
Relaxation m 6.0 

 33m Placing BoomWorking Variety :

Tower Column Concrete Inserting Boom Installation:

Tower Positioning Boom Job website Performance:

 

Quality High Grade Steel Concrete Placing Boom with Self Jack-up Hydraulic System

TAGs: