
| CZPTtity(Bins) | one – one | >1 |
| Est. Time(days) | 3 | To be negotiated |
Our organization can source a massive quantity of piston pump (motor) components, Distinct models are as follows:
We sell the hydraulic piston pump (motor) which at present has a lot more than 1185 varieties of varieties and reducer assembly parts varieties has more than 12367 varieties of (which includes plunger sliding boots, cylinder, oil distribution plate, swing, variable piston, push shaft, skeleton oil seal, equipment pump, rod, pressure plate, central shaft, spindle, inclined plate, the ball hinge spring, ball joint, back again plate, the thrust plate, friction plate, separator, oil distribution disc plug, bushing spring and other areas).We feel there is usually a merchandise that you will require.
Product Description:
Far more brands of pumps parts:
HITACHI Series:
HPV050 HPV080 ZX120-6 major pump (HPK055) HPV091 (EX200-two-thirds, EX120-two single pump) HPV102 (EX200-five/six) HPV116 (EX200-1) HPV118 (ZX200-3, ZX270 major pump) HPV125B (UH07 UH083) HPV145 (EX300-one/2/three) EX400-5 main pump EX60 – two-thirds of rotary motor EX105-two motors EX120-2 rotation EX120-5 rotary (AP5S67) ZAX120 rotation EM56 stroll HMGC16 (going for walks EX100-one) HMGC32 (strolling EX200-1) Strolling HMGC35 (EX200-5) Walking EX550-3 HMGE36EA (ZX200 strolling) HMF160 Strolling ZX330-2.
CZPT EXCAVATOR Sequence:
HPV35 (PC60) HPV55 (PC120) HPV90 (PC200-three) HPV90 (PC200-five) PHV95 (PC200-6, PC120-six in addition to the pump shaft). HPV132 (PC300-seven, PC400-six) HPV160 (PC300/four hundred-three/5) HPV135 PC30UU PC40-8 principal pump PC50 (PC55/56) PC60-7 principal pump (HPV75) PC160 PC200-two (main pump) PC200-eight primary pump/PC240-eight major pump PC320 PC360-7 major pump (PC300-seven) PC400-7 main pump PC1250 main pump PC45R-eight rotation PC60-6 rotation PC60-seven rotary PC120-6 rotation PC200 – 6 rotary/LMF45 PC200-7 rotary motor PC450 rotation PC300-six rotation PC200-7 stroll PC400-7 wander HPV220-8 rotation PC650 rotary.
CAT Collection:
VRD63 (CAT120) double pump SBS80 (CAT312C) primary pump E200B (new) double pump AP – twelve double pump AP-fourteen (CAT325C) CAT320C double pump SPK10/ten (E200B) double pump SPV10/10 (MS180) double pump CAT12G CAT14G / 16 g CAT215 CAT245 Walking CAT330B motor Strolling PSV450 (AP-12) CAT992 CAT330C stroll CAT385H.
KYB Series:
PSVD2-sixteen e (1.six 2 tons of sunvo smart) PSVD2-21 c (KYB) PSVD2-21 e (KYB) four t/SVD22 little dig principal pump 27 PSVD2-26 e/e (KYB) KYB – 25 cc (45 ishikawa island, lengthy yasuda K040 / K045) Ishikawa island 60 PSVL-54 (yasuda KYB extended 6 tons of one hundred fifty five motorists) PSVK2-25 KMF40 KMF40-2 KMF90 (KPV90) PC200-1/two/three (rotary, walking) KMF105 KYB33 KYB36 KYB37 KYB87 KYB90 (MSG – sixty p) MSG – 27 p (KYB)/LSGMF27/ten w MSG-44 p (KYB)/LSGM44/ten w-R21 Mag-vp-480-e-two (4-five.5 tons of little excavators going for walks motor) MSF-85 (as an alternative of ZF motor) PSV2 sumitomo one hundred twenty-55 t (KYB) Sumitomo 280 rotary V25..
CZPT Sequence:
PVD-two-b-32 l PVD-2-b-34 wander PVD-two-b-34 l (little dig principal pump) PVD 38/forty-two-36 b/l PVD-2-b-42 PVD -2-b-sixty three PVD45 Nachi a hundred thirty PVK-2-b-505 (ZAX55 primary pump) YC35-6 yuchai tiny dig a rotary motor YC35-6 yuchai little dig strolling motor PCLS 18-two hundred-b (yuchai fifty five rotary) The bobcats 331 motorists (rotary) The bobcats 337 going for walks (motor).
TOSHIBA Sequence:
SG02 SG571 (MFB40) SG04 (MFB80) SG08 (MFB160) SG12 SG20 (MFB250) PVB92 (PVC90RC08 / PVC70R) (8.five tons of motorists Toshiba eight tons, yuchai) PV090 PV092 (PV080 gm) PSVS – 90.
JIC Sequence:
JMV-forty four/22 JMV-fifty three/34 (6 to eight tons of modest excavator going for walks motor) JMF-64 JMV147/ninety five JMF-151-VBR (22 sm1510117) JMF-one hundred fifty five.
LIEBHERR Sequence:
LPVD45 LPVD64 LPVD75 LPVD90 LPVD100 The new LPVD100 (914) LPVD125 The new LPVD125 LPVD140 LPVD250 LPVD260.
KOBELCO/KATO Series:
SK250-8 main pump SK200 – a third going for walks motor SK220-three (MA340 strolling motor) SK200-six strolling motor SK200-six new going for walks Walking SK320 motor M3V150 (SK220-2) going for walks motor Walking SK430 motor Kato 400 motorists motor HD450V – 2 (kato) HD3000 DH55 fifty five motorists rotary motor (daewoo) T3X128 / daewoo 300-7 rotary Daewoo walk 225-7 Daewoo DH370 rotation Contemporary 60-seven rotary motor Contemporary 480 rotary motor.
CZPT Series:
K3SP36C (SDV36) 8 tons medium-sized motorists principal pump K3V63DT (K3V63BDT) K3V112DT K3V140DT K3V180DT K3V280 K3VG280 K3VG180 K3VL45 K5V80 K5V140 (doosan three hundred-7) K5V160 (modern day 300-6 main pump) K5V200 (450/470 in Japan, god steel 470, Keith 480 principal pump) K7V63 NV64 NV84 NV111DT NV137 NV172 NV270 NX15 NVK45 metal drivers (god) KVC925 KVC930 KVC932.
CZPT SWING Collection:
M2X63 M2X96 (EX200-2) M2X120 M2X146 (EX200-five) M2X150/a hundred and seventy (EX400) M2X210 (EX270/280/three hundred) M5X130 (CAT320C) M5X180 (metal 350-8 god) MX150 MX173 MX500 MAG150 MAG170 LZV30 LZV120 LVW060 TM40VD walk Modern day 300-five.
NABTESCO Vacation Sequence:
M2X63 M2X96 (EX200-2) M2X120 M2X146 (EX200-five) M2X150/a hundred and seventy (EX400) M2X210 (EX270/280/300) M5X130 (CAT320C) M5X180 (steel 350-8 god) MX150 MX173 MX500 MAG150 MAG170 LZV30 LZV120 LVW060 TM40VD wander Modern day three hundred-five.
CZPT Series:
A4V40 A4V56 A4V71 A4V125 A4V250 A4VFO28 A4VSO40 A4VSO71 A4VSO125 A4VSO180 A4VSO250 A4VSO355 A4VSO500 A4VF500 / A4F500 A4VG28 (A4F571) A4VG40 A4VG45 A4VG50 A4VG56 A4VG71 A4VTG71 A4VG90 (32 A4VT90HW/r) A4VHW90 A4VTG90 fill oil pump (thick) A4VG125 A4VG125 pump A4VG125 pump sort (typical use) A4VG125 pump sort A10VO28 (string) A4VG12 fill oil pump (big) A4VG140 A4VG180 A4VG250 A10SO16/eighteen A10VSO28 A10VSO45 A10VSO45/fifty two A10VSO63/fifty two A10VSO63/fifty three A10VSO71 A10VSO85 A10VSO100 A10VSO140 A10VG18 A10VG28 A10VG45 A10VG63 A10V43 (double pump) A10V63 A10VD40 (double pump) A10VD43 (double pump) A10VE43 A10VEC60 A10VSF28 A11V040 A11VG35 A11VG50 A11VO60 A11VO75 A11VO95 (A11V95) A11V130 A11V145 A11V160 A11V190 (A11VLO190) A11VO200 A11VO250 A11VL0260.
CZPT BEND AXIS Collection:
A2F5A2F12A2F23A2VK282VK28A2F28A2F55A2F80A2F107A2F160A2F200 A2V225A2F250A2V500A2V915A2F355A2F500A2F1000A2FO10A2FO12A2FO16A2FO23A2FO28A2FO32A2FO45A2FO56A2FO63A2FO80A2FO90/A2FE90A2FO107A2FO125(A2FM125)A2FO160A2FO180A2FO200A2FO250A2FO500A6V28A7V55/A8V55A7V58A7V80/A8V80A7V107/A8V107A7V160/A8V160A7V200A7V225A7V250A7V355A7V500A6VM/A7V1000A6VM/A7VO12A7VO28A7VO55A7VO80A7VO107A7VO160A6VM160A6VE160A6VM200A6VM500A7VO172A7VO200A7VO250A7VO355A7VO500.
CZPT-UCHIDA Series:
one(CZPT)A8VO55/A8VO80/A8VO80/6.three/A8VO107(SUMITOMO 280)/A8VO140/A8VO160/A8VO200
2(CZPT)AP2D12(BOBCAT 331MAIN PUMP)/AP2D16(Scenario 35)/AP2D21/AP2D18(IHISCE 45 Primary PUMP)/AP2D25(DH55 Principal PUMP)/AP2D36/ZAX70 Major PUMP
CZPT Sequence:
PV20PV21(PVD21)PV22PVD22PV23(PVD23)PV24SPV6/119PV25PV26PV112OPV27MF16AMFO35MF500MPVO46/M46MPR63MPV45.
CZPT ninety Series:
PV90R30PV90R42PV90R55PV90R75PV90R100BRL100PV90R130PV90R180PV90R250SPV14SPV15SPV18MMF571CMPT044M44HRR057.
EATON Sequence:
3321/3331 (Eaton, 006) Eaton 3322 (EATON3322) 4621/4621-007 5421/5431 (Eaton 23) Keith 1460 (CASE1460) Keith CS05A Eaton 3932-243 Eaton 6423 (Eaton 24-7620-7621) Roller (Eaton, 78462).
EATON-VICKERS Collection:
PVE19TA19PVE21PVH45PVH57PVH74PVH81PVH98PVH106(HPN-1398)PVH131PVH141PVB5PVB6PVB10PVB15(PVQ32)PVB20PVB29PVBQA29-SRPVQ40/50PVB110TB35B45.
TOKIWA Series:
MKV23/MKV33
TADANO Sequence:
(TADANO)a hundred/one hundred fifty
HAWE Collection :
V60AV60AV30D95V30Z95V30D140V30D250
LINDE Series:
HPV55T HPR75 HPR100 HPR105 HPR130 HMR135 HPR160 , 160 B2PV35 B2PV50 (BPR50) B2PV75 (BPR75) B2PV105 (BPR105) B2PV140 BPV35 BPV50 BPV70 BPV100 BMV75.27 BPR140 BPR186 BPR260 BMF50 BMF75 BMF105.
PARKER SERIES:
F11-005F11-571F11-571F11-28F11-39F11-58F12-060F12-080/F12-090F12-one hundred ten-MF-1HF11-150F11-250PVXS130PVXS180PVXS250PVSO250PV180PV250PLV250PVM-018PVM-571BMHQ30/PV180PAVC38PAVC65PAVC1002145/P214523PZ075270/PV270PVP76PV29PV74PV0087P76PVG130 BPSV600PVT38PVT38PVT64PK100PMT14/18P080P2105P2060BZ732-100SH5V/131.
YUKEN Collection:
A16A22A37A45A56A70A90A145
HARVESTER Sequence:
HPVMF23(T23C)HPVMF23.7T28CT30CT37C
All these equipment are totally interchangeable with CZPT, higher good quality and minimal price tag.
Our Company Services
1) We can help purchasers design certain merchandise or produce items in accordance to buyers’design
2) We can print brand according to buyers’ requirement
three)We has exported to a lot of countries,such as Korea, United states of america, German, and so on.
Consumer Support
one. You may possibly electronic mail us via the Alibaba messaging program if you have a query
or would like to post a comment.
two. CZPTly, e-mail will be responded to inside of 24 hrs besides on each Sunday
and vacations. We will reply as quickly as we back again in place of work.
2. We will ship you monitoring data to the e-mail address you have registered with Alibaba.
3. If you do not see what you are hunting for, just ship us an e-mail with photograph/picture
and we will be happy to assist you.
four. Optimistic opinions is extremely essential to us.
Packaging & CZPT
Shipping Information
Shipping time is dependent on the destination and other factors, it may up to 7 function times.
In buy to guarantee you receive you order tax totally free upon import, we will declare it as a “Sample”with a lower price.This decrease value does not replicate the total price tag you paid out.
Soon after we ship the merchandise, we will e-mail you the delivery information, as effectively as tracking quantity.
FAQ
Queries you maybe inquiry
Q1:Could you personalized items?
We can manufacture it in accordance to your drawings or samples.
Q2: I want to acquire your goods, how can I pay out?
A :You can spend via T/T , WEST UNION or other payment conditions we attain arrangement.
Q3: How can you assure the good quality?
A: 1 year’s warranty against B/L day.
If You satisfy with quality issue, we guarantee to liable for it.
This fall: If we never uncover what we want on your site, what ought to we do?
A: You can e mail us the descriptions and images of the items you need, We will verify no matter whether we can make it.
Q5: Can we buy one pc of every single product for quality tests?
A: Yes, we realize quality check is critical and we are happy to deliver 1pc for good quality tests.
Q6: What is the guide time?
A: For this product, typically three days,3 times and direct time is calculated from the working day we receive your deposit.
Specific time is established by manufacturing facility routine.
