
Technological Description
| Mould Closing System | |
| Work Stations | eight |
| Clamping Force (kg) | 150000 |
| Mould-Opening Stroke (mm) | 350-400 |
| Standard Thickness of Mould (mm) | one hundred-210 |
| Mould Plate Size (mm) | two(290*550) |
| Height of Injection Nozzle (mm) | sixty |
| Method of Heating | electrical |
| Heating Power (kw) | eight.04 |
| Injection System | |
| Injectors (established) | 2 |
| Diameter of Screw (mm) | 60 or 70 |
| L/D Ratio of Screw | 23 |
| Max Injection Capacity (cc) | 920-1100 |
| Injection Pressure | -1100 |
| Injection Speed (cm/sec) | 10 |
| Rotating Speed of Screw (r.p.m) | -a hundred ninety |
| Temperature Control (area) | 4 |
| CZPTity Consumption | |
| Heater Barrel (kw) | twelve.one |
| Motor for Injector Moving (kw) | 1.five |
| Heating Board of Mould (kw) | 102.four |
| CZPT System (kw)(50hz) | 59 |
| Vacuum Pump (kw) | 2.two |
| Cooling Fan of Barrel (HP) | 1 |
| Total CZPTity (kw) | a hundred and eighty |
| Oil Tank Size (L) | one thousand |
| Machine Weight (kg) | 29000 |
| Machine dimension(m) | eight.5 *four.five*2.76 m |
Thorough Description :
Its every day productivity is 2*eighteen*8*24=6912 pairs by concept calculation.for 1 pair in one mould,For 2pairs in 1 mould is 6912*two=13824 pairs for every 24hours
Be aware:
1.Its merchandise assortment contains EVA mid-soles,rainboots,slippers,sandals, clogs,sport protectors and a variety of kinds of shoes and shoe components and is dependent on the EVA shoe mould.
2.The clamping drive can be elevated from a hundred and fifty to 210 tons, in accordance to your requirement.
three.The foam EVA injection molding machine is fully hydraulic and automatic operation apart from taking out item.
four.It is PLC controlled, its humanized parameter personal computer procedure interface give swift and precise terms of creation.
Character:
one.Minimal operation top,Operation peak in accord with human engineering
2.Additional peak opening stroke
Act by fixed opening stroke: 350mm, which is not affected by any mould thickness alterations and
three.obtainable for 2plates mould,Mould thickness adjusting mechanism
Mould altering scope: one hundred-200MM
four.Speedy mould opening ,Act by toggle mechanism which opens the mould rapidly
five.Fast injector movement
Pushed by linear-track, allowing fast shifting and precise positioning,CZPT conserving design and style
six.No need to have h2o circulation for mould station
seven.Place saving design,Put oil tank together with injection base, which helps make the structure compact and saves a lot more place.
Expression:
All quotations are without value-added tax.
Delivery day:Inside sixty times After obtaining the 30% earnest income
Payment expression: Progress payment at buy 30%, 70% ahead of cargo
Shipping and delivery Condition: Devices ended up taken aside and packed in suitable package deal that matches container transport
For the machine experiment and set up, our technician will be sent to your
manufacturing unit. And you are asked for to pay for the expense of their excursion and payment .
Also Our technician will deal with all the equipment things for you and at the very same time prepare your workers on how to use and sustain the equipment.
Assure Time: One particular-calendar year warranty and lifelong provider. During ensure period of time, the expense of any CZPT or new accessory should be borne by the seller, and the freight for delivery of CZPT will be on the buyer’s account.
