Work Flexible Cut to Length Line Roll Forming Machine for Gi PPGI Steel Material

Work Flexible Cut to Length Line Roll Forming Machine for Gi PPGI Steel Material

                    .5-one.0mm*1250mm Cut TO Duration LINE Device

one. Information of YX1250-1. Minimize to Duration Machine  Line

Content
Content Thickness(&):.five-1.0mm
 
Applicable material:Galvanized Steel Coils, Very hot Rolled Coils,Cold Rolled Coils,yield energy 245Mpa or 550Mpa
Equipment Parts
1)CZPT Decoiler: one particular established  
Un-powered, Manually manage metal coil interior bore shrinkage and stop
Max Feeding width:1250mm,coil ID selection 508mm±30mm
Potential: Max. 5 Ton

                         

2)   Cold Rolling Mills:
Ideal Content thickness(mm): 0.five-1.
Width(mm):400,650,800,a thousand,1250
Line velocity:15-18m/moment
With shearing function
With rubber rolling feeding device
Primary equipment motor:7.5KW
With PLC handle technique

 

 
three)CZPT Reducing unit
Post to cut, quit to chopping,Two pieces type of chopping blade design and style, no blanking
CZPT motor: 5.5KW Cutting force: -16Mpa
Cutting tool materials: Cr12MoV
Warmth treatment method to HRC58-62 degree 
The cutting electricity is offered by the principal engine hydraulic station

 

four)PLC Manage System
Control The CZPTtity And Cutting Length Automatically
Input The Generation Knowledge(Generation Batch,pcs,Size,and so forth.)On The Touch Display ,
It Can Finish The Production Immediately.
Blended With: PLC, Inverter, Contact Display screen, Encoder, and many others
PLC:Siemens (German brand)/Schneider(French manufacturer)
Inverter:Siemens (German model)/Schneider(French model)
Encoder: Omron (Japan brand)
Swap Base, Reveal Light, Electricity Offer, Intermediate Relay, AC Contactor,
Lower-to-Duration Tolerance≤±1 mm
Manage Voltage 24V

 

 
five) Exit Rack Un-driven, 3 units       
    

two. Device Functions of YX1250-one. Lower to Length Machine  Line

The benefits of metal roof panel chilly roll forming machineare as follows:

one.Straightforward procedure, reduced routine maintenance expense
2.Substance conserving

3.Short building period

4.Price conserving

After-Sale Support
1. The warranty is 24 months after the client receives the machine.
Within the 24 months, we will courier the replacement parts to the client free of charge
2. We offer technical support for the entire life of our machines
three. We can send our technicians to install and train the workers in the clients’ factories with 
extra cost

Phrases Of CZPT
one.Minimum order quantity (MOQ): 1 Set
two.Delivery time: about 45 workdays
3.Port of loading: port of HangCZPT
4.Type of payment: by T/T or by L/C
5.Export:to far more than 60 international locations and regions, which includes ZheCZPT , British isles, France, Singapore,
Greece, Australia, USA, Mexico, Brazil, Chile, Xihu (West Lake) Dis.through, Trinidad, Israel, Saudi Arabia, and so forth

Packing Design
Packing approach: Main body of device is bare and coated by plastic film(to safeguard of dust and corrosion),
loaded into container and steadily set in container appropriate by metal rope and lock, suitable for prolonged-distance transportation.

ABOUT BMS
Factory

EXHIBITION

                High quality IS OUR Culture!
   
                    IF U ARE Fascinated OUR Machines ,
                        Please Make contact with WITH ME!

            
                                    
 

 

Work Flexible Cut to Length Line Roll Forming Machine for Gi PPGI Steel Material